Filming Schedule


This is the schedule for this Saturday, for the movie "A Bit of Love." For this Schedule I took into account all of the other group members schedules. However, with some work related things I had to inform a group member to change their own personal schedule. This filming session will be the first of two that we will be doing. However this will be the longest one. The filming process should only be around three to four hours depending on the setup time and the constant costume changes that I will be doing and helping the actors do. The props, costumes, settings and changes, and the food, will all be coordinated by me. The CCR will be set up as well but only minorly to see how it may flow when we film it. This means that the time of the shooting of the film will also be managed by me. I will finish up making the props and the many different types of costume pieces.
  The camera will be checked out by someone else and will be brought to the filming set. The setting will be the house that was shown in the last blog. With this filming process the health risks are very minimal to none. Due to the fact the car won't be moving. The things that will be happening in the house are eating and breaking plates. This will also not be a risk cause we will be braking it over a plastic bag and the person braking it will wear gloves. This will also be monitored by adults. The movie will last for two minutes. It will take a couple of takes to get the filming right so, we don't have to struggle while editing. The editing process will come later. After the shooting of the film we will clean up and try to think about how to approach the CCR. 

No comments:

Post a Comment